Construction of an Overflow Basin for the Fuel Tank at the University Presidency Building

04 March 2025

 

As part of ongoing efforts to enhance infrastructure and safety standards, the Department of Construction and Projects has completed the construction of an overflow basin for the fuel tank supplying the generator at the University Presidency Building. The project was executed under the highest engineering standards and civil defense requirements. The basin was designed in compliance with civil defense regulations to ensure safety in emergencies. All construction work was carried out according to approved plans, adhering to the highest safety and quality standards.

Project Objectives:
• Enhancing environmental protection by preventing potential fuel leaks.
• Ensuring the safe management of fuel storage and usage in line with best engineering practices.
• Creating a safer and more sustainable working environment within the university.

This project aligns with the university’s vision of developing its facilities to establish a secure and sustainable environment, keeping pace with the latest engineering advancements while reinforcing safety across all university facilities.

 

We have 99 guests and no members online

133047
TodayToday3
YesterdayYesterday17
This_WeekThis_Week140
This_MonthThis_Month610
All_DaysAll_Days133047
Highest Visitors 10-24-2024 : 757

                                               website designer

Top