The Department of Construction and Projects has done comprehensive rehabilitation work on two elevators in the Telecommunications Engineering Department. The tasks performed included the replacement and installation of some parts, as well as general maintenance to ensure optimal elevator performance.
Work completed on the first elevator:
- The light sensor in the first elevator was replaced to ensure accurate response and effectiveness in opening and closing operations.
- The door motor was changed to ensure smooth opening and closing of the elevator doors.
- The main control panel was replaced to ensure stable performance and high efficiency in elevator operation.
- Batteries in the UBS backup power system were replaced.
Work completed on the second elevator:
- The information strip between the cabin and the control panel was changed.
- The UBS power system equipment in the backup power system was replaced with reprogramming.
Additionally, the following tasks were carried out on both elevators:
- Calibration of the car weights with floor levels.
- Replacement of steel cables.
- Oil change and addition of new oil.
- Maintenance of both interior and exterior doors.
The maintenance was completed according to technical standards and requirements. Smooth and efficient operation was ensured. Verification was conducted to confirm that the elevators meet strict safety requirements.

![]() |
![]() |
|
![]() |
![]() |